+91-471-2554714, +91-471-2554715 +91-471-2554716 info@kudumbashree.org
Pradhan Manthri Awas Yojana(PMAY)

The Hon'ble President of India, in his address to the Joint Session of Parliament on 9th June, 2014 had announced "By the time the Nation completes 75 years of its Independence, every family will have a pucca house with water connection, toilet facilities, 24x7 electricity supply and access." Hon'ble Prime Minister envisioned Housing for All by 2022 when the Nation completes 75 years of its Independence. In order to achieve this objective, Central Government has launched a comprehensive mission "Housing for All by 2022" Housing for All (HFA) mission is since launched in compliance with the above objective of the Government and with the approval of competent authority. The mission seeks to address the housing requirement of urban poor including slum dwellers through following programme verticals:

Scope

"Housing for All" Mission for urban area will be implemented during 2015-2022 and this 1.1 Mission will provide central assistance to implementing agencies through States and UTs for providing houses to all eligible families/beneficiaries by 2022. Mission will be implemented as Centrally Sponsored Scheme (CSS) except for the component 1.2 of credit linked subsidy which will be implemented as a Central Sector Scheme. A beneficiary family will comprise husband, wife, unmarried sons and/or unmarried daughters. 1.3 The beneficiary family should not own a pucca house either in his/her name or in the name of any member of his/her family in any part of India to be eligible to receive central assistance under the mission. States/UTs, at their discretion, may decide a cut-off date on which beneficiaries need to be resident of that urban area for being eligible to take benefits under the scheme. Mission with all its component has become effective from the date 17.06.2015 and will be implemented upto 31.03.2022.

Coverage and Duration

All 4041 statutory towns as per Census 2011 with focus on 500 Class I cities would be covered in three phases as follows: Ministry, however, will have flexibility regarding inclusion of additional cities in earlier phases in case there is a resource backed demand from States/UTs. The mission will support construction of houses upto 30 square meter carpet area with basic civic infrastructure. States/UTs will have flexibility in terms of determining the size of house and other facilities at the state level in consultation with the Ministry but without any enhanced financial assistance from Centre. Slum redevelopment projects and Affordable Housing projects in partnership should have basic civic infrastructure like water, sanitation, sewerage, road, electricity etc. ULB should ensure that individual houses under credit linked interest subsidy and beneficiary led construction should have provision for these basic civic services. The minimum size of houses constructed under the mission under each component should conform to the standards provided in National Building Code (NBC). If available area of land, however, does not permit building of such minimum size of houses as per NBC and if beneficiary consent is available for reduced size of house, a suitable decision on area may be taken by State/UTs with the approval of SLSMC. All houses built or expanded under the Mission should essentially have toilet facility. The houses under the mission should be designed and constructed to meet the requirements of structural safety against earthquake, flood, cyclone, landslides etc. conforming to the National Building Code and other relevant Bureau of Indian Standards (BIS) codes. The houses constructed/acquired with central assistance under the mission should be in the name of the female head of the household or in the joint name of the male head of the household and his wife, and only in cases when there is no adult female member in the family, the house can be in the name of male member of the household. State/UT Government and Implementing Agencies should encourage formation of associations of beneficiaries under the scheme like RWA etc. to take care of maintenance of houses being built under the mission.

 

Projects Approved under PMAY as on 28th Feb 2017
Sl No District Name Town Name Phase No.of projects approved No of beneficiaries
Approved Amount in Lakhs
1 Alappuzha  Alappuzha 1 1 2278 6834
2 Kozhikode  Kozhikode 1 1 1783 5349
3 Kollam  Kollam 1 1 1422 4266
4 Malappuram  Malappuram1 1 1 477 1431
5 Kannur  Kannur 1 1 491 1473
6 Idukki  Thodupuzha 1 1 485 1455
7 Thrissur  Thrissur1 1 1 270 810
8 Pathanamthitta  Pathanamthitta 1 1 213 639
9 Wayanad  Kalpetta 1 1 258 774
10 Kasaragod  Kasaragod 1 1 167 501
11 Palakkad  Palakkad 1 1 605 1815
12 Eranakulam  Kochi 1 1 1528 4584
13 Malappuram  Malappuram2 1 1 229 687
14 Thiruvananthapuram Thiruvananthapuram 1 1 1397 4191
15 Thrissur  Thrissur2 1 1 204 612
16 Kottayam  Kottayam 1 1 335 1005
17 Alappuzha  Kayamkulam 2 1 305 915
18 Kozhikode  Vadakara 2 1 270 810
19 Malappuram  Thrippunithura 2 1 240 720
20 Kannur  Thalassery 2 1 210 630
21 Thrissur  Chavakkad 2 1 355 1065
22 Thiruvananthapuram Nedumangad 2 1 850 2550
23 Pathanamthitta  Thiruvalla 2 1 361 1083
24 Thrissur  Guruvayoor 2 1 394 1182
25 Thrissur  Irinjalakuda 2 1 184 552
26 Thrissur  Kodungallur 2 1 169 507
27 Malappuram  Manjeri 2 1 530 1590
28 Eranakulam  Maradu 2 1 155 465
29 Thiruvananthapuram Neyyattinkara 2 1 500 1500
30 Palakkad  Ottappalam 2 1 426 1278
31 Malappuram  Ponnani 2 1 563 1689
32 Kozhikode  Quilandy 2 1 633 1899
33 Eranakulam  Thrikakara 2 1 133 399
34 Eranakulam  Tirur 2 1 80 240
35 Palakkad  Chittur-Thathamangalam 3 1 314 942
36 Kollam  Karunagappally 3 1 200 600
37 Eranakulam  KOOTHATUKULAM  3 1 161 483
38 Kannur  Koothuparamba 3 1 279 837
39 Alappuzha  Mavelikkara 3 1 80 240
40 Kollam  Punalur 3 1 200 600
41 Thiruvananthapuram Varkala 3 1 261 783
    Total   41 19995 59985

Scheme Guidelines

Guideline Malayalam PMAY
Guideline English PMAY

GOI formats /orders /Amendments

Housing For All Plan of Action (HFAPoA) Check List
Revised HFAPoA formats
National Urban Rental Housing Policy Draft
Model state Urban housing policy for Urban Areas
GoI: Amendment inclusing of planning area
GoI: Amendment Enhancement under BLC
GoI: Amendment CLSS

Minutes

State Level Appraisal committee
SLAC-08-02-2017 PMAY DPR Approval
SLAC-12-01-2017 PMAY DPR Approval
SLAC-05-10-2016 PMAY DPR Approval
SLAC-02-03-2016 PMAY DPR Approval

Minutes

State Level Advisory committee
SLAC-08-02-2017 PMAY implementation strategy

Minutes

State Level Sanctioning committee
SLSMC 16-02-17 PMAY DPR Approval
SLSMC 16-01-17 PMAY DPR Approval
SL SMC -28-12-2015 Constitution of committees
SL SMC -02-03-2016 PMAY DPR Approval
SLSMC 07-10-16PMAY DPR Approval

CLSS

NOC format
List of Banks (Under NHB)
List of Banks (Under HUDC0)
Presentation on CLSS (By SLBC)Eng
Presentation on CLSS (By SLBC)Mal
NPV Calculator
CLSS-Circular 1 Dated:-12-04-2016 Eng
CLSS-Circular 1 Dated:-12-04-2016 Mal
CLSS-Circular 2 Dated:-11-05-2016 Eng
CLSS-Circular 2 Dated:-11-05-2016 Mal
CLSS-Circular 3 Dated:-08-06-2016 Eng
CLSS-Circular 3 Dated:-08-06-2016 Mal
CLSS-DO Letter1 Dated:-21-06-2016 Eng
CLSS-DO Letter2 Dated:-21-06-2016 Eng
CLSS-DO Letter3 Dated:-21-06-2016 Eng

SLNA ORDERS and Formats

DPR toolkit for BLC new construction
Order- Beneficiary Led Construction-Enhancement

• Application format for PMAY benefit

• ID card for beneficiary

• Agreement format -Enhancement

• Agreement format -New House construction
Circular 2-Implementation of PMAY part 3
Circular 2 -Regarding the Implementation Strategy PMAY part 2
Circular 1-Regarding the Implementation of PMAY part 1
Fund sharing pattern and installment release stages
GO Instructions regarding the implementation of PMAY
Reconstitution of SLSMC
GO PMAY BLC Eligibility, Ownership and fund sharing of Beneficiaries under PMAY

Back To Top